Included with Pro and the Pro trial

Risk assessments and method statements for UK trades.

When a client asks for a risk assessment and method statement, start from the job already in FieldQuote. Record the site, hazards, controls and work sequence, then save a reviewed version as a PDF.

From the job record to a reviewed document

  1. Open RAMS from a job. The job title, business, client and available site address help start the draft. Check the address is the actual work site.
  2. Assess the task and site. Record who may be harmed, how, the controls, responsibility and review dates. Hazard prompts help you consider the work; you provide the actual assessment.
  3. Write the method. Describe preparation, the work sequence and handover, including the controls and responsible people at each step.
  4. Record a competent review. An organisation owner or admin checks the saved revision and records their name, role and declaration. Missing required fields, unassessed risks and high remaining-risk entries block issuing. The reviewer remains responsible for the assessment and controls.
  5. Download the version you need. Draft PDFs are labelled as drafts. Issued copies retain the reviewed text; subsequent edits create a new draft. Share the PDF through your normal client or site process.

What is included?

Site arrangements

Scope, access, services, competence, equipment, materials, PPE, permits, welfare and emergencies.

Risk assessment

Hazards, people affected, possible harm, controls, remaining risk, responsible people and actions.

Method statement

An editable sequence of work with a named responsible person for each step.

Review and records

Saved drafts, version checks, reviewer details and downloadable PDFs. Existing records remain readable if Pro ends.

RAMS checklist before work starts

A completed form is only part of managing risk. Use this checklist alongside a competent assessment of the actual work:

  • Match the site and scope. Confirm where the work will happen, who else may be affected and what is excluded. Record known services, access restrictions and relevant site information.
  • Check controls in practice. Identify how harm could occur, consider removing the hazard, and choose suitable controls. Record who is responsible and when actions will be completed. Do not treat PPE as the only control.
  • Plan the work sequence. Include preparation, the task, making the area safe and handover, with supervision, equipment and any specialist assessments or permits needed.
  • Prepare for problems. Record site-specific emergency, first-aid and rescue arrangements. Establish when work should stop and who can agree a changed method.
  • Review, brief and monitor. Check the current revision, explain it to the workforce and confirm understanding. Review when conditions change or controls prove ineffective, including after a near miss.

These are planning prompts, not an exhaustive assessment or permission to start work. The HSE risk-management steps explain identifying, controlling, recording and reviewing risks.

A plumbing job needs its own assessment

For a pipework repair in an occupied property, consider the actual service isolation, hidden services, access, occupants and potential water damage. If the work involves hot work, suspect asbestos or other specialist risks, identify the appropriate arrangements before proceeding. These are prompts, not a complete assessment or instructions for carrying out the work.

Write the method in the order the work will happen, with the responsible person at each step. Review the assessment when the site, task or controls change, and brief everyone affected.

Electrical work needs competent, task-specific planning

Record the actual installation, nearby occupants and other contractors, the competence required, and the arrangements for identifying and controlling electrical hazards. Address access, tools, testing and handover as relevant to the job. FieldQuote does not determine whether an installation is safe or provide an isolation procedure. Higher-risk work may need specialist advice, permits and separate assessments before it can proceed.

A tool for recording your assessment

FieldQuote does not inspect the site, certify safety or automatically produce a compliant assessment. A competent person must identify the hazards, choose and verify suitable controls, brief the people carrying out the work and review changes. Specialist assessments and permits may be needed; RAMS do not replace a construction phase plan.

Read the HSE guidance on managing risks and construction method statements. FieldQuote is not endorsed by HSE.

Common questions

What does RAMS mean?

RAMS means risk assessments and method statements. The risk assessment identifies who could be harmed, how and the controls needed. The method statement explains the sequence of work and how those controls will be applied.

Is RAMS included in FieldQuote Pro and the trial?

Yes. Preparing and issuing job-linked RAMS is included with FieldQuote Pro and the Pro trial, with no separate RAMS charge. Existing saved documents remain readable and downloadable when Pro or the trial ends; creating and editing documents requires current Pro or trial access.

Can staff prepare a RAMS document?

Staff, admins and owners with Pro access can prepare drafts for their organisation. An owner or admin records the competent review and issues a version. Viewers can read and download existing documents.

Does issuing RAMS email the client?

No. Issuing saves the reviewed version. Download its PDF and share it through your normal client or site process. Later edits create a new draft, and each issued PDF retains the text reviewed for that version.

Does FieldQuote automatically create a compliant risk assessment?

No. FieldQuote provides an editor, hazard prompts, required-field checks and document records. A competent person must assess the actual site, choose and check the controls and review the work method. Completed fields or an issued PDF do not certify that the work is safe or legally compliant.

Can I reuse the same assessment on every job?

Each document must reflect the actual task and site. Review the controls when people, equipment, substances or working methods change, if controls are no longer effective, or after problems or near misses. Brief the people doing the work on the current arrangements.

See the current pricing and billing terms. Try the public editor before signing in; the demo does not save real job documents or issue RAMS.